August 2014 Second Large Bed CNC Installed Since introducing an in-house CNC & Design Studio last year, it has shown rapid growth and become an integral part of the New Product Development team within Leeways. Not only has the CNC
April 2012 News – London to Paris Charity Cycle Ride
April 2012 London to Paris Charity Cycle Ride Last month, Lee Walding our Technical Director and Adam Walding the Director of our sister company Leeways Joinery along with 4 friends, took on the challenge of cycling from London to Paris.
February 2012 News – Leeways exhibits at Packaging Innovations 2012
February 2012 Leeways exhibits at Packaging Innovations 2012 For the second year running, Leeways Exhibited at the NEC for Packaging Innovations. Showcasing some new products recently introduced to the market place such as our medical packaging range and the 4
June 2011 News – Factory Extension
June 2011 The construction of an additional 17,500 square foot extension to our factory was started in May 2011 and is scheduled to be completed by the end of August. This will help to optimise material flow through the factory.
May 2011 News – New high speed fully automated five station production line
May 2011 Another of our major investments for 2011 was the purchase of a high speed fully automated five station production line which allows us to form, punch, pad, cut and stack. The main component of this high speed line
January 2011 News – New large bed GN machine
January 2011 In January 2011 we purchased a fully automated, large bed GN machine to compliment our existing range of production lines, which has enabled us to be more competitive as well as increasing our capacity in this machine group.